Select Items to send.

No items selected to share

Select Users to send No items to.

No userss selected

Share Items


Send me a copy of this message.
Copy this message to the file.

11 Roberge Close, St. Albert

Lot Address
11 Roberge Close
St. Albert, Alberta
Riverside 1A-1B
Block 1, Lot 67

152 5301
Approval Agent
Requester Contact
Ironstone Home Builders
This is a Ironstone Home Builders show home

Property & Legal Address

Lot Details


Lot Location

Assigned Builder

Lot Specifications

Tree Vouchers

Tree Planting

Lot Design Information

House Design Information

Unit Contact Information

Activity Data

Buyer 1 Information

Buyer 2 Information

Elevations

Add new elevation

Drag to reorder

Floorplan Images

Add new floorplan image

Drag to reorder

Floorplan PDFs

Add new floorplan PDF

Drag to reorder

Custom Fields

Custom Fields (Continued)

News Feed

Showing 5 of 46 Events Show All
-
All Activity

LEED Program Status Set to: LEED Certified


Wahid Moshfegh


Can you please confirm that your recycling rate is 100% meaning no waste was landfilled?

- Documented in Letter Attached.

When you said the 'fireplace in not installed', does that mean you do not yet have the specs for it, or the homeowner will be purchasing it, or that there is not fireplace in this home?

- No Fireplace is in this Home. See Plans in system.

Do you have anything else that shows the type of bulbs installed, the receipt does not show that they are LED or CFL as far as I can tell.

- No. all bulbs were changes to LED at time of possession.

Do you have anything showing that at least 90% of the insulation and drywall was extracted and manufactured within 800kms from the project site? The document you sent does not state exactly where the product was harvested from as well as manufactured.

- Documentation onsite says where it is from. Insulation is 80% of mass being manufactured and installed regionally within 800 km radius of project by truck From Edmonton, Alberta CA. Drywall says it is not.

You did not send any information on the VOC amounts of any adhesives and sealants used on site (such as PL etc.)

- Yes Attached. We do not use PL in our foundations.

Can you also provide the room by room load calculations as well as the MERV value of the filter(s)?

- Attacehd and Merv filters are all installed.

Files Attached:

Reservations Status Set to: Sold


Kaitlyn Allcock-D'silva


Can you please confirm that your recycling rate is 100% meaning no waste was landfilled?

When you said the 'fireplace in not installed', does that mean you do not yet have the specs for it, or the homeowner will be purchasing it, or that there is not fireplace in this home?

Do you have anything else that shows the type of bulbs installed, the receipt does not show that they are LED or CFL as far as I can tell.

Do you have anything showing that at least 90% of the insulation and drywall was extracted and manufactured within 800kms from the project site? The document you sent does not state exactly where the product was harvested from as well as manufactured.

You did not send any information on the VOC amounts of any adhesives and sealants used on site (such as PL etc.)

Can you also provide the room by room load calculations as well as the MERV value of the filter(s)?

Wahid Moshfegh


Files Attached:

Primary Elevation

Lot Elevation Image

Rear Elevation

Lot Elevation Image

Side Elevation

Lot Elevation Image

Approved Materials & Colors

Exterior Finish Material Manufacturer Colour
Roof Asphalt IKO Driftwood
Walls - Main Siding Vinyl Mitten Aviator Green
Walls - Secondary Siding Vinyl Mitten Clay
Walls - Accent Wood Paint to match Black
Fascia & Rainware Aluminum Royal Linen
Soffit N/A N/A N/A
Door & Window Frames N/A N/A N/A
Trims/Battens Aluminum Royal Linen
Masonry Manufactured Stone Eldorado Silverton Mountain Ledge Panels
Front Door N/A N/A N/A
Garage Door N/A N/A N/A
Front Steps/Porch (Vertical Exposed Surfaces) N/A N/A N/A
Front Railing N/A N/A N/A
Columns N/A N/A N/A
Deck (Vertical Exposed Surfaces) N/A N/A N/A
Deck Railing N/A N/A N/A
Driveway N/A N/A N/A
Remove colors Restore colors

Approving Authority

Lewis Donnan
Genstar Edmonton
stephen.gomori@streetscape.ai
Denise Giroux
Genstar Edmonton
stephen.gomori@streetscape.ai
Shane Leppky
Genstar Edmonton
stephen.gomori@streetscape.ai
Clayton Schweb
Genstar Edmonton
CSchweb@genstar.com
James Song
Genstar Edmonton
stephen.gomori@streetscape.ai
Nimita Tembhurne
Genstar Edmonton
stephen.gomori@streetscape.ai

Approval Agents

Requester

Wahid Moshfegh
Ironstone Home Builders
stephen.gomori@streetscape.ai
Primary Contact
Dhiresh Narayan
Ironstone Home Builders
stephen.gomori@streetscape.ai
Primary Contact
Nicole Pedersen
Ironstone Home Builders
stephen.gomori@streetscape.ai
Primary Contact
New Library Item

Document Library

Show: All | Active | Inactive | Archived

Type Title Date Added Added By Scope Status
Riverside Builder Kit Documents2019-05-22 20:02:20E2 + AssociatesCommunity
Lot Holds2019-05-23 15:20:35Streetscape Operations CenterCommunity
LEED for Homes2019-05-23 15:23:47Streetscape Operations CenterCommunity

Show: All | Active | Inactive | Archived

Type Title Date Added Added By Scope Status

Documents

Title Builder Description Doc Owner Date Added Status

R
Reset
00:00:00hr | min | sec
Log Time