Select Items to send.

No items selected to share

Select Users to send No items to.

No userss selected

Share Items


Send me a copy of this message.
Copy this message to the file.

982 Berg Place, Leduc

Lot Address
982 Berg Place
Leduc, Alberta
Black Stone 3
Block 6, Lot 27
Approval Agent
SJS Homes Ltd.
Requester Contact
SJS Homes Ltd.
This is a SJS Homes Ltd. show home

Property & Legal Address

Lot Details


Lot Location

Assigned Builder

Lot Specifications

Tree Vouchers

Tree Planting

Lot Design Information

House Design Information

Unit Contact Information

Activity Data

Buyer 1 Information

Buyer 2 Information

Elevations

Add new elevation

Drag to reorder

Floorplan Images

Add new floorplan image

Drag to reorder

Floorplan PDFs

Add new floorplan PDF

Drag to reorder

Custom Fields

Custom Fields (Continued)

News Feed

Showing 5 of 29 Events Show All
Show: All Activity Events
-
All Activity
Shared Private

Arch Inspections Status Set to: Non-Compliant - Re-submission Required


The following people have been notified automatically:

  • Simran jit Bains (SJS Homes Ltd.)

Shared Private

Service Completion: Arch Inspections (Live Inspection)


Inspection reviewed: NON-COMPLIANT Re-submission Required

We have determined that the dwelling and related improvements are NON-COMPLIANT with the standards set by the Developer (or Municipality).

Primary Elements of Non-Compliance (in order of prominence):

1/ Parging exceeds the maximum allowable 12" on the exposed, front elevation.

We further determine that Compliant status IS ATTAINABLE through reasonable remediation efforts by the Builder - uploading photos showing clearly that deficiencies have been addressed. Recommendation for compliance is to install planting bed with landscaping to cover the deficiency. In the interim, we have set the Status of this Inspection as NON-COMPLIANT - Re-submission Required.

If the builder does not wish to address the deficiency, inspection determination can stand and be submitted to developer for review (subject to potential penalties and deductions to compliance deposit) Please review highlighted section in the AC inspections Guide (attached here).

Files Attached:

Shared Private

Arch Inspections Status Set to: Fielding Complete - Review Pending


The following people have been notified automatically:

  • Simran jit Bains (SJS Homes Ltd.)

Shared Private

Time Entry: Arch Inspections (Live Inspection)


Files Attached:

Primary Elevation

Lot Elevation Image

Rear Elevation

Lot Elevation Image

Side Elevation

Lot Elevation Image

Approved Materials & Colors

Exterior Finish Material Manufacturer Colour
Roof Asphalt IKO Dual Black
Walls - Main Siding Vinyl Royal Brownstone
Walls - Secondary Siding Vertical Vinyl Royal Bark
Walls - Accent N/A N/A N/A
Fascia & Rainware Aluminum Alumipro (Royal) Cobblestone
Soffit Aluminum Alumipro (Royal) Cobblestone
Door & Window Frames PVC (Vinyl) Durabuilt White
Trims/Battens Aluminum Alumipro (Royal) Cobblestone
Masonry N/A N/A N/A
Front Door Painted Dulux DLX1054-7 Chocolate Eclair
Garage Door Painted Dulux DLX1001-1 Delicate White
Front Steps/Porch (Vertical Exposed Surfaces) Concrete Precast - Broom Finish Gray
Front Railing N/A N/A N/A
Columns Painted Dulux To match Trims/Battens
Deck (Vertical Exposed Surfaces) N/A N/A N/A
Deck Railing N/A N/A N/A
Driveway N/A N/A N/A
Remove colors Restore colors

Approving Authority

Paul Biagi
Maclab Development Group
stephen.gomori@streetscape.ai
Janelle Brenner
Maclab Development Group
stephen.gomori@streetscape.ai
Joshua Cura
Maclab Development Group
stephen.gomori@streetscape.ai
Jenn Squires
Maclab Development Group
stephen.gomori@streetscape.ai

Approval Agents

Requester

SJS Homes Ltd.
Simran jit Bains
SJS Homes Ltd.
stephen.gomori@streetscape.ai
780-966-0162
Primary Contact
New Library Item

Document Library

Show: All | Active | Inactive | Archived

Type Title Date Added Added By Scope Status
Landscaping Variance2021-11-02 17:16:50Maclab Development GroupCommunity
Black Stone - Plot Plans - Stage 7A2023-06-21 14:44:09E2 + AssociatesCommunity
Black Stone Builder Info2025-09-10 15:20:57Maclab Development GroupCommunity

Show: All | Active | Inactive | Archived

Type Title Date Added Added By Scope Status

Documents

Title Builder Description Doc Owner Date Added Status

R
Reset
00:00:00hr | min | sec
Log Time