Video Tutorial is Pending
Thanks for your interest, but we don't have a Video Tutorial for this page quite yet.
We've sent a message to request this Video Tutorial get added.
Add a New Library Item
Add a New Media Item
Document Library
Do you need forms, instructions or information to complete your request? See the Document Library. Don't see what you need? Ask for help.
Time & Billing
Streetscape Billing - Record your Service Activity
Streetscape Time Tracker - Record your Time
Work in Progress (WIP)
Unsaved Changes
Information on this page has been modified. Do you want to save your changes before switching tabs?
Manage Labels
Black Stone 3, Block 6, Lot 27
982 Berg Place
Leduc, Alberta
Labels are INTERNAL and only visible to your group, E2 + Associates.
Reset Lot?
You have changed the Assigned Builder on this lot. We recommend that you RESET the lot to remove any information related to the previous Builder.
When you RESET a Lot the following will occur:
- Approved exterior design selections will be removed
- Approved elevation will stay (to show a previous approval had been made)
- All Activity will be set to Internal (to the Group that added it). This will hide anything private that pay belong to the previous Builder .
Document has been set as "New"
You have set this document as "New".
This document will be featured as "New" for the next 7 days. Users who are signed up for Document Notifications will be notified that this document has been updated.
Set as "New"?
We noticed you that updated the document's location. Do you want to set this document as "New".
File Sharing
File name
You can manage the sharing of this file directly on the Neighbor Report as well.
982 Berg Place, Leduc
Leduc, Alberta
Black Stone 3
Block 6, Lot 27
You have indicated that this lot is a show home. Do you want to also update the Reservations status to "Show Home"?
Arch Inspections Status Set to: Non-Compliant - Re-submission Required
The following people have been notified automatically:
- Simran jit Bains (SJS Homes Ltd.)
Aug 14th 2022 9:15am
By: Patrick Lewthwaite, E2 + Associates
support@e2.associates
Service Completion: Arch Inspections (Live Inspection)
Inspection reviewed: NON-COMPLIANT Re-submission Required
We have determined that the dwelling and related improvements are NON-COMPLIANT with the standards set by the Developer (or Municipality).
Primary Elements of Non-Compliance (in order of prominence):
1/ Parging exceeds the maximum allowable 12" on the exposed, front elevation.
We further determine that Compliant status IS ATTAINABLE through reasonable remediation efforts by the Builder - uploading photos showing clearly that deficiencies have been addressed. Recommendation for compliance is to install planting bed with landscaping to cover the deficiency. In the interim, we have set the Status of this Inspection as NON-COMPLIANT - Re-submission Required.
If the builder does not wish to address the deficiency, inspection determination can stand and be submitted to developer for review (subject to potential penalties and deductions to compliance deposit) Please review highlighted section in the AC inspections Guide (attached here).
Files Attached:
Aug 14th 2022 9:15am
By: Patrick Lewthwaite, E2 + Associates
support@e2.associates
Arch Inspections Status Set to: Fielding Complete - Review Pending
The following people have been notified automatically:
- Simran jit Bains (SJS Homes Ltd.)
Aug 3rd 2022 12:38pm
By: Patrick Lewthwaite, E2 + Associates
support@e2.associates
Time Entry: Arch Inspections (Live Inspection)
Files Attached:
Aug 3rd 2022 12:38pm
By: Patrick Lewthwaite, E2 + Associates
support@e2.associates
Simran jit Bains
Files Attached:
Jul 29th 2022 8:54am
By: Simran jit Bains, SJS Homes Ltd.
stephen.gomori@streetscape.ai
Rear ElevationSide Elevation |
Approved Materials & Colors
|
Approving Authority
Approval Agents
Requester
Document Library
Show: All | Active | Inactive | Archived
| Type | Title | Date Added | Added By | Scope | Status | ||
|---|---|---|---|---|---|---|---|
| Landscaping Variance | 2021-11-02 17:16:50 | Maclab Development Group | Community | ||||
| Black Stone - Plot Plans - Stage 7A | 2023-06-21 14:44:09 | E2 + Associates | Community | ||||
| Black Stone Builder Info | 2025-09-10 15:20:57 | Maclab Development Group | Community | ||||
Media
Documents
| Title | Builder | Description | Doc Owner | Date Added | Status | |
|---|---|---|---|---|---|---|
